Skip to content
-
Prior to 2005
- Dr. Sam Weaver and Dan Hensley form partnership in 1972.
- Four successful exits prior to 2005.
- Specialized in material science, high-temperature thermochemical and energy systems.
-
2005
- Proton Power, Inc. is incorporated.
-
2008
- Development begins on first CHyP® pyrolysis unit.
-
2009
- Development is completed on first CHyP® unit for making hydrogen.
- R&D begins on biomass-to-electricity system.
-
2011
- CHyP® unit is commissioned by University of Tennessee.
-
2012
- PPI leases fabrication plant.
- R&D begins on biomass-to-synthetic fuels process.
-
2013
- Rockwood brownfield facility is purchased.
- Biomass-to-electricity system is commissioned by Wampler’s Farm Sausage.
- The “Christmas Miracle”– the direct conversion of biomass-to-diesel is achieved.
- Laboratory facility is purchased.
- R&D begins on Pro-C® biochar applications.
-
2014
- Rockwood biomass-to-diesel demo system is commissioned.
- Bay Minette brownfield biomass-to-diesel facility is purchased.
-
2015
- R&D begins on developing graphene products from Pro-C® biochar.
-
2016
- PPI leases assembly facility.
-
2017
- Module 1 of the Rockwood biomass-to-diesel system is commissioned.
- ProCnano® graphene first enters production.
- PPI receives EPA 40 CFR Part 79 diesel fuel registration.
- PPI receives IRS diesel fuel registration.
-
2019
- ProCene® graphene first enters production.
- Biomass-to-biochar system is commissioned in Kentucky.
- First successful production of diesel fuel from MSW pellets.
-
2020
- Module 2 of the Rockwood biomass-to-diesel system is commissioned.
- R&D begins on developing batteries from PPI graphene.
-
2021
- Bay Minette biomass-to-diesel system is commissioned.
- First prototype batteries are produced using PPI graphene.
-
2022
- Lithium batteries produced with PPI graphene achieve significant performance improvement compared to traditional lithium-ion batteries.
- PPI graphene batteries surpass 1000 cycles of testing.
- Testing of PPI graphene in asphalt by the University of Tennessee suggests a 2.5x increase in road life.
-
2023
- Biomass-to-diesel system is commissioned in Singapore.
- PPI begins partnership with Faradyne Power Systems to produce energy storage systems using PPI graphenes.
- PPI begins partnership with Low Carbon Emissions Technologies to develop turnkey MSW-to-diesel facilities.
- PPI receives first order for ProCene® graphene to be used in supercapaciters.
- R&D begins on Faradyne energy storage system.
- The University of Tennessee begins independent testing of ProCnano® in concrete.
- Auburn University begins independent testing of ProCene® in asphalt.
-
2024
- Design prototype of the Faradyne energy storage system is completed.